Zhengzhou YIFAN's Sand Making Machine mainly including vibrating feeder,jaw crusher, rock crusher, vertical shaft impact crusher and the stone crusher. Sand and power unit should be installed firmly. If the production line is installed for long-term use, it should be fixed on the basis of cement; if it is a mobile operating unit, then it should be installed in the base unit made of angle iron. In addition. Operators should ensure that the sand machine pulley groove and power machine are rotating in the same plane.
- Do not replace the pulley to prevent the excessive speed of the grinding chamber as it will produce an explosion , or low speed and poor work efficiency of the machine.
- Sand start idling 2 ~ 3min, there is no anomaly after the feeding .
- Sand installation after inspection departments fasteners fastening , if loose to be tighten . The same time to check the belt tightness is appropriate.
- Sand start before hand to rotate the rotor , check the tooth claw hammer and rotor operation is reliable and flexible, with or without shell collision phenomenon , whether the direction of rotation of the rotor machine arrow refers the same direction , the power machine and sand lubrication is good.
- https://www.affordablecebu.com/