The rate translation applied for by MERALCO, upon initial evaluation by the ERC, was found to be in conformity with the Final Determination and with the requirements of the Rules in Setting Distribution Wheeling Rates (RDWR). MERALCO was in adherence with the uniform filing requirements of the ERC. The functionalization and allocation factors were well-structured and supported by detailed analyses. The provisionally approved rates for RY2012 for MERALCO are shown hereunder:
|
Units |
ERC-Approved Rates for RY2011 |
ERC-Approved Rates for RY2012 |
Incr./(Dec.) |
DISTRIBUTION |
||||
Residential & General Service A |
|
|
|
|
Up to 200 kWh |
P/kWh |
0.9300 |
1.0278 |
0.0978 |
201-300 kWh |
P/kWh |
1.3383 |
1.3851 |
0.0468 |
301-400 kWh |
P/kWh |
1.7235 |
1.7223 |
(0.0012) |
401 kWh & Over |
P/kWh |
2.3943 |
2.3096 |
(0.0847) |
General Service B (Small NIS/IS) |
|
|
|
|
|
P/kW |
269.75 |
263.20 |
(6.55) |
|
P/kWh |
0.0282 |
0.1000 |
(0.0182) |
General Power |
|
|
|
|
Secondary |
P/kW |
269.75 |
263.20 |
(6.55) |
Below 13.2 kV |
P/kW |
205.18 |
200.00 |
(5.18) |
13.8/13.2 kV |
P/kW |
205.18 |
200.00 |
(5.18) |
34.5 kV |
P/kW |
205.15 |
200.00 |
(5.15) |
115 kV & 69kV |
P/kW |
165.04 |
160.00 |
(5.04) |
Unit charge : General Power users |
|
|
|
|
Normal consumption |
P/kWh |
0.0282 |
0.1000 |
(0.0182) |
34.5 kV (with ODPS load) |
P/kWh |
0.0282 |
0.0400 |
0.0118 |
115 kV (with ODPS load) |
P/kWh |
0.0282 |
0.0400 |
0.0118 |
GHMS |
P/kWh |
0.9200 |
0.9200 |
0 |
Flat streetlights |
P/kWh |
2.0700 |
|
|
125W MV or 70W HPS |
Lamp |
|
89.46 |
|
250W MV or 150W HPS |
Lamp |
|
142.71 |
|
400W MV or 250W HPS |
Lamp |
|
238.56 |
|
400W HPS |
Lamp |
|
370.62 |
|
SUPPLY |
||||
Residential & General Service A |
|
|
|
|
|
P/Cust./mo |
21.12 |
18.00 |
(3.12) |
|
P/kWh |
0.6349 |
0.5475 |
(0.0874) |
General Service B (Small NIS/IS) |
P/Cust./mo |
941.60 |
400.00 |
(541.60) |
General Power |
|
|
|
|
Medium (Demand 40-200 kW) |
P/Cust./mo |
2,153.00 |
910.00 |
(1,243.00) |
Large (demand 200-750 kW) |
P/Cust/mo. |
10,950.00 |
3,775.00 |
(7,175.00) |
Very & extra large (demand >= 750 kW) |
P/Cust./mo |
18,160.00 |
13,703.00 |
(4,457.00) |
GHMS |
P/Cust./mo |
372.30 |
300.00 |
(72.30) |
Flat streetlights |
P/kWh |
0.7700 |
|
|
125W MV or 70W HPS |
Lamp |
|
29.40 |
|
250W MV or 150W HPS |
Lamp |
|
46.90 |
|
400W MV or 250W HPS |
Lamp |
|
78.40 |
|
400W HPS |
Lamp |
|
121.80 |
|
METERING |
||||
Residential & General Service A |
|
|
|
|
|
P/Cust./mo |
5.00 |
5.00 |
0 |
|
P/kWh |
0.4658 |
0.3664 |
(0.0994) |
General Service B (Small NIS/IS) |
P/Cust./mo |
484.20 |
390.00 |
(94.20) |
General Power |
|
|
|
|
Medium (Demand 40-200 kW) |
P/Cust./mo |
1,136.00 |
915.00 |
(221.00) |
Large (demand 200-750 kW) |
P/Cust./mo |
4,710.00 |
3,795.00 |
(915.00) |
Very & extra large (demand >= 750 kW) |
P/Cust./mo |
16,140.00 |
13,006.00 |
(3,134.00) |
GHMS |
P/Cust./mo |
351.40 |
300.00 |
(51.40) |
AVERAGE RATE |
P/kWh |
1.6464 |
1.6012 |
(0.0452) |
"The benefit of Performance Based Regulation (PBR) is now becoming more evident with these lowered distribution rates of MERALCO and the corresponding improved quality service levels. Note that the same decreasing rate pattern was likewise experienced in the case of the transmission rates approved for the National Grid Corporation of the Philippines (NGCP)”, ERC Chairperson and CEO Zenaida G. Cruz-Ducut remarked.