Therefore, floor laying process is reasonable, it is very important. Should avoid the following errors paving method, so as not to shorten the life of the floor.
1. the ground is uneven: the uneven ground cause some floor and keel vacant, the stampede will beep.
2. Keel without drying: without drying the moisture content of wood keel is usually about 25%, while qualified wood flooring moisture content at 12% humidity difference is too rapid moisture absorption of wood flooring, caused the floor bagging, paint surface burst. The construction of the first paved flooring and other construction, and then on the floor, which is the common practice of the renovation team. But this, after flooring often need to go through a month or longer to polish painting. During floor with ambient moisture, chemicals without any quarantine measures, is likely to lead to the wooden floor deformation and cracking due to drastic changes in the moisture content. wood plastic composite wall board
3. assembled too loose or too tight: the wooden floor as the environmental temperature and humidity changes, expansion or contraction. Therefore, in the laying of the floor, should be based on the use of high and low temperature and humidity of the place reasonable arrangements for the wooden floor of the assembly tightness. If too loose, floor contraction appears larger gap, too tight, the floor will inflate bagging.
4. and hit wedge plus nails fixed: construction, hit wedge plus nails fixed way too small so will result due to the contact surface of the wedge with nails nail holding power, and can easily cause the wood keel loose and stampede flooring will sound.
- https://www.affordablecebu.com/